logo

The Next Era of Stowage Planning

Upload your packing list, select a vessel and start stowing directly in a true 3D cargo hold and deck environment. Every placement considers actual obstructions, deck strength limits and required clearances. Build complex stowage plans for breakbulk and project cargo in minutes instead of hours.

Try for Free Forward
Stowage Planner 3D workspace showing bow, starboard 3D and top views of a vessel loaded with crates, pipes and containers

The Problem

A packing list says what must sail.
Whether it fits is still a manual, expert-driven exercise.

The hardest stowage calls are still made across a spreadsheet, a two dimensional CAD drawing and a separate load calculation. Every change costs an hour, and every handover is a chance for the plan to slip out of sync.

01

Flat plans hide three-dimensional conflicts

A plan can look clean from above while cargo still fouls a tweendeck, a hopper side, a frame or the unit beside it. The clash only shows up once loading begins.

02

Placement and engineering checks happen apart

Placement, deck limits and stack loads are checked in separate tools. Move one piece of cargo and every check has to be redone by hand.

03

Repetitive cargo consumes planning time

Placing hundreds of crates, coils, pipes, plates or containers one by one turns skilled planners into CAD operators.

04

The final drawing drifts from the working plan

Once a layout is redrawn after planning, it no longer matches the model. Vessel, the office, the client can each end up looking at a different version of the plan.

The Solution

What if every stowage plan arrived already checked in 3D?
Ready for your port captain to review and approve?

Stowage Planner 3D puts the entire breakbulk and project cargo workflow into one 3D model. Placement, clearance checks, point loads, stack limits, support equipment and the final published layout all live in the same place. You load a cargo list and pick a vessel. You set your placement rules. The system then fills whole loading areas with arrangements ready for your technical team to review.

What used to take days of manual placement and redrawing back and forth between planners and CAD now gets done in an afternoon.

Conventional stowage planning

  • Generic boxes on a simplified drawing
  • Manual placement, copying and redrawing
  • Deck limits checked after the fact
  • Plan, report and vessel handover kept apart
SECURELOAD

Stowage Planner 3D

  • Real vessel zones and true cargo geometry
  • Point, preview and fill complete rows or tiers
  • Clearance, point load and stack margins as you place
  • Layouts generated from the model you approved

Under the hood

What the workspace actually does

Every angle of stow at once

Top, side and aft stay linked as you zoom and pan, and the selected unit highlights in all three at once. Virtual gravity settles cargo onto what is really beneath it, so vertical relationships are visible instead of assumed.

  • Real vessel zones, frames, bulkheads and decks
  • Drag-and-drop with snap and collision prevention
  • Live zone, clearance, LCG and TCG feedback
Bow, starboard and top views of the same vessel shown side by side with cargo and dimensions

Bulk placement without the bulk work

Pick Loading Point turns repetitive placement into a controlled sequence. Set tiers, rows, spacing and direction, read the engineering result before anything lands, then commit and auto-advance until the quay is clear.

  • Equal spacing and arbitrary rotation
  • Quantity, tonnage, point load and margin left
  • Large runs saved as a single fast CAD block
Pick Loading Point workflow for placing repetitive cargo in rows and tiers

Cargo behaves like itself, not like a box.

Coils nest by diameter, plates stack by calculation and containers follow the slot grid. Heavy project units sit on their defined support equipment, and mixed cargo can be levelled to one working plane.

Coils & pipesSteel platesContainersProject cargoPaper rollsWind sections
Close 3D view of two coaches stowed on deck between crane pedestals and stanchions

The plan you worked on is the plan you send.

Nothing gets redrawn by hand. The stowage plan is generated from the live model, cargo references are checked against the load list, port data stays current and every approved layout has a version history behind it.

  • Side, top and aft views with legends
  • Draft and Approved stamps with IMDG marks
  • Vector PDF, PNG and DXF export
Published stowage layout drawing with profile, section and two level views plus a title block

The Workflow

From open voyage to approved layout

The same order a port captain already works in, from opening the voyage to issuing the approved layout.

01

Load the packing list

Bring in the cargo list and the vessel together. Cargo zones, slot grid, load list and voyage particulars all come from one project file.

02

Sort and filter the quay

Sort cargo by weight, dimensions, port or reference and filter down to what you want to place next. The quay view and the remaining totals update to match your selection.

03

Set the rules

Choose tiers, rows, spacing and rotation. Snap, gravity, alignment and load checks are on by default, so you only set what changes for this cargo.

04

Point, preview, fill

Pick the loading corner and see the quantity, tonnage, point load and remaining margin before anything is placed. Commit when the numbers look right.

05

Handle specialist cargo

Switch modes for coils, plates, containers, levelled stacks or units that need support equipment. Each one stows the way it does in practice.

06

Review and publish

Work through the comments, approve the plan and issue the layout as industrial standard drawings. Every published version stays tied to the model it came from.

Stowage Planner 3D for

Port Captains & Stowage Planners

Port Captains & Stowage Planners

Plan a full voyage in a fraction of the time while keeping control of spacing, direction, tiers, limits and every exception you make.

Chief Officers & Masters

Chief Officers & Masters

Review the same model the planner built, see every flagged override, comment on a unit or a deck, and approve a version that stays on record.

Charterers & Project Teams

Charterers & Project Teams

Answer "will it fit" before quoting, compare arrangements side by side, and show clients a plan they can read.

Operations & Commercial Teams

Operations & Commercial Teams

See progress and remaining cargo without waiting on a redrawn plan or a status email.

cta

Ready to transform your 
cargo operations? 

Contact Us